We Deliver Innovative Solutions For Complex Energy & Environmental Problems
PAST PROJECTS
At CORAL for Environmental Services (CES), we take pride in our strong track record of delivering high-quality consulting, environmental, and energy services across Yemen. Over the years, CES has supported international and local clients in meeting regulatory, environmental, social, and technical requirements while ensuring compliance with both Yemeni legislation and international standards (World Bank, UN, etc.).
Our projects span Environmental & Social Impact Assessments, Energy & Climate Change Counseling, Baseline Surveys, Techno-Commercial Counseling, Humanitarian Programs, and Waste Recycling. Each engagement reflects CES’s ability to integrate local expertise, international standards, and practical solutions that help clients achieve sustainable and successful outcomes.
Below is a snapshot of our completed projects:
​​
-
Environmental & Social Impact Assessment (ESIA) – 6 Projects
-
ESIA Study for Block 34 (2009): Pre-Seismic Surveying & Geophysical Exploration ESIA Study in Jiza area, Al-Mahrah Governorate, Yemen.
Client: -
ESIA Study for Block 19 (2011): Pre-Seismic Surveying & Geophysical Exploration ESIA Study in Al Jawf Governorate, Yemen.
Client: -
ESIA Study for Block 37 (2009): Pre-Seismic Surveying & Geophysical Exploration ESIA Study in Marait area, Al-Mahrah Governorate, Yemen.
Client: -
ESIA Study for Block 86 (2011): Pre-Drilling Exploration ESIA Study in Gayle Bin Yumain, Hadhramout Governorate, Yemen.
Client: -
ESIA Study for Block 28 (2011): Pre-Seismic Surveying & Geophysical Exploration ESIA Study in Shabwah Governorate, Yemen.
Client: -
ESIA Study for Block 57 (2011): Pre-Seismic Surveying & Geophysical Exploration ESIA Study in Al Jawf–Shabwah Governorates, Yemen.
Client: ​
2. Energy & Climate Change Counseling – 5 Projects
-
“‘Overview of Renewable Energy and Carbon Emission Reduction Potential from Diesel-Operated Water Pumps (Solar vs. Fuel), Al Hudaydah Governorate’”. (2018)
Client: -
“Carbon Footprint Estimation -Switching from Diesel to 2 MW Solar Power”. (2015).
Client: -
“Energy Estimation from 5 tons/day Waste Facility at Taiz City”. (2018),
Client: LOGS, Dubai. -
“Assessment of Greenhouse Gas Emissions from Marib Oil Refinery”. (2012),
Client: -
“Energy Efficiency Evaluation (ongoing): Energy Efficiency Review for Diesel-Operated Power Plants Powering the Existing Manufacturing Facilities”.
Client: (confidential)
-
Baseline Survey & Stakeholder Engagement (2024): Increasing Access to Efficient and Clean Cooking in Yemen (WB Funded Project).
Client: Energy Market Global Limited (UK) -
Baseline Survey & Stakeholder Engagement (2023): Yemen Oil & Gas Sector Diagnostic (WB Funded Project).
Client: Energy Market Global Limited (UK) -
Baseline Survey & Market Study (2007): Local Consumption and International Natural Zeolite Product Trade Prospects.
Client: Srorzeolite for Trading Co., Ltd -
Humanitarian Programs Baseline Survey (2022): Baseline data collection, needs assessment, and stakeholder workshops for UNOPS to establish humanitarian infrastructure projects in Yemen.
Client: UNOPS -
Humanitarian Programs Baseline Survey (2018): Community surveys and consultancy services for Oxfam’s humanitarian program expansion in Yemen.
Client: Oxfam -
Baseline Study & Public Consultation (2016): Baseline Survey and Public Consultation for Potential Switch from Diesel-Operated Water Pumps to Solar-Operated in Al Hodeidah Governorate.
Client: -
Baseline Survey (2005): Baseline Survey and Overview of Existing Marine Ecology in Ras Issa Peninsula, Yemen.
Client:
3. Baseline Surveys & Counseling – 7 Projects
4. Techno-Commercial Counseling - 4 Projects
​
-
Pre-Feasibility Study (2019): Technical feasibility of constructing vs. upgrading the existing 26” Ras Issa pipeline in Yemen.Client: PELOPROMLISATCIA
-
Feasibility Study (2014): Switching from diesel to heavy oil power-operated engine (2 MW).
Client:
-
Feasibility Study (2008): Establishment of a natural zeolite extraction & production facility in Taiz, Yemen,
Client: Alix Yemen Natural Zeolite -
Feasibility Study (2012): Upper Nile Oil Refinery (10,000 BPD) feasibility study, South Sudan., South Sudan.
Client: -
Contract Review (Ongoing): Advisory on Oil & Gas contract frameworks (FEED, EPC, PMC, PSA, JOA, Sales & Offtake Agreements).
-
Regulatory Advisory (2009–2017): Evaluations and recommendations for EPA covering:
​​
